Politics

New bridge to be constructed over Saptakoshi river with ADB support

New bridge to be constructed over Saptakoshi river with ADB support
Photo credit: The Rising Nepal

Saptari, Oct 30: A three-kilometer long bridge connecting Kanchanpur of Saptari to Rajabas of Sunsari is going to be constructed as the alternative to the present Koshi Barrage Bridge. The Koshi barrage bridge connects Saptari and Sunsari districts.  

The bridge is to be constructed based on the detailed project report prepared few years ago. The estimated cost of the bridge is Rs 43 billion, shared Director at the Department of Roads Project Directorate, Chuda Raj Dhakal.  

Originally published by The Rising Nepal on Oct 30, 2026 Read the full article at risingnepaldaily.com
Read original
About this page. The Ditible is an aggregator. This article was imported from a publisher feed and may have been reformatted. Copyright remains with the original publisher, and the headline, image and any quoted text are used for attribution and indexing purposes. Source links are preserved on every item in the archive.
Share

Comments

0 comments

No comments yet — be the first.

More from The Rising Nepal

View source

Related